DM header

DM header
Quartzsite, Arizona
Showing posts with label Bouse AZ. Show all posts
Showing posts with label Bouse AZ. Show all posts

Wednesday, August 8, 2012

Construction planned for Hwy. 72 between Bouse and Parker

Arizona Department of Transportation

ADOT on Facebook  ADOT on Twitter  ADOT on YouTube  
Road repairs on State Route 72 scheduled to begin this weekend
Minor delays expected for motorists traveling between Bouse and Parker

YUMA – The Arizona Department of Transportation is scheduled to begin a project to repair several sections of State Route 72 between Bouse and Parker. Work is scheduled to take place between 6 a.m. and 6 p.m. daily beginning Friday, August 10 through Thursday, August, 16.

What to expect during work hours:
  • Intermittent lane closures of approximately three mile segments during work hours.
  • Traffic will need to come to a complete stop while workers direct traffic through the work zone.
  • Delays of approximately 15 minutes may be experienced.
  • Reduced speed limits through the work zone.
  • Law enforcement will be on-site to control traffic and monitor speeds.
ADOT advises drivers to proceed through the work zone with caution, slow down and be alert for construction equipment and personnel.

ADOT works to inform the public about planned highway restrictions, but there is a possibility that unscheduled closures or restrictions may occur. Weather can also affect a project schedule. To stay up-to-date with the latest highway conditions around the state, visit the ADOT Traveler Information Center at www.az511.gov or call 5-1-1.

For more information about this project, please visit www.azdot.gov/statewide  or contact Yuma District Senior Community Relations Officer Gabriella Kemp at 928.317.2165, gkemp@azdot.gov or ADOT Community Relations Officer, Paki Rico, at 520.388.4233, prico@azdot.gov.

Thursday, September 15, 2011

Flu Vaccine for Parker, Bouse, Salome, Ehrenberg dates

FLU VACCINE CLINICS SET


La Paz County, AZ- The dates are set for the first La Paz County adult flu clinics and the La Paz County Health Department has plenty of vaccine. The influenza vaccine will be provided at

Parker High School on September 21st from 4-6pm; Bouse Booster Club on September 27th from 11:30-12:30pm; and at McMullen Fire Department in Salome on October 3rd from 2-3pm; Ehrenburg Fire Department October 5th from 9:30-11:30am. Clinics for Quartzsite will be scheduled at a later date. Children’s flu clinics will be conducted in conjunction with the area schools.

A ten dollar donation for the influenza vaccine is appreciated for the adult vaccine. There is very little wait time with the Health Department influenza vaccine clinics. The Health Department does not bill Medicare for the vaccine so the lines move quickly.

Each flu season is unique, but Centers for Disease Control and Prevention (CDC) estimates that, on average, approximately 5% to 20% of U.S. residents get the flu. Even though influenza is a common illness, it can have serious complications. Some of the complications caused by flu include bacterial pneumonia, dehydration, and worsening of chronic medical conditions, such as congestive heart failure, asthma, or diabetes. Children may get sinus problems and ear infections as complications from the flu. Those aged 65 years and older and persons of any age with chronic medical conditions are at highest risk for serious complications of flu. More than 200,000 persons are hospitalized for flu-related complications each year. About 36,000 Americans die on average per year from the complications of flu.

Thursday, August 18, 2011

Intermittent lane closures on Interstate 10 east of Quartzsite begin Monday



Motorists should expect 15 minute delays


The Arizona Department of Transportation will begin to repair segments of pavement along Interstate 10 between Quartzsite and the Bouse Wash Rest Area Monday (Aug. 22) and through Wednesday (Aug. 31). Intermittent lane closures are planned during work hours which will take place between 2 a.m. and 6 p.m. each day. There will be no work on Fridays or over the weekend. Drivers should plan ahead and expect approximately 15 minute delays.

The work consists of removing and replacing pavement along segments of eastbound and westbound I-10 beginning east of Quartzsite to the Bouse Wash Rest Area. Trucks carrying loads wider than 12 feet will not be allowed to travel through the work zone during work hours.

Message boards will advise drivers of lane restrictions. To ensure safety in the work zone, the speed limit will be reduced to 45 mph. Law enforcement will be on-site to help monitor speeds and control traffic.

ADOT advises drivers to proceed through the work zone with caution, slow down and be alert for construction equipment and personnel.

ADOT works to inform the public about planned highway restrictions, but there is a possibility that unscheduled closures or restrictions may occur. Weather can also affect a project schedule. To stay up-to-date with the latest highway conditions around the state, visit the ADOT Traveler Information Center at www.az511.gov or call 5-1-1.

Followers

Search This Blog